VIN WBS43AZ02RCP62199 — 2024 BMW M4

Lot #94050325 · COPART · Sale 2026-05-19

2024 BMW M4, with VIN WBS43AZ02RCP62199, has front end damage, with 14,530 mi on the odometer, located in TX - HOUSTON, (sold for $0).

This 2024 BMW M4 (VIN WBS43AZ02RCP62199) is a Copart auction lot, with recorded front end damage, showing 14,530 miles, located at TX - HOUSTON. Below is a full breakdown — condition, mileage, value, title status, and how to buy it — plus a link to the complete VIN history report auction listings don't include.

Vehicle facts

Lot specifications
VINWBS43AZ02RCP62199
Year2024
MakeBMW
ModelM4
Body stylev
Colorwhite
Cylinders6
Fuelpetrol
Transmissionauto
Odometer14,530 mi
Odometer brandA
Primary damageFRONT END
Secondary damageREAR END
Title documentTx - Salvage Vehicle Title
Has keysNo
LocationTX - HOUSTON
Sale date2026-05-19
PriceSold for $0
SourceCOPART
Lot #94050325

About this lot

This 2024 BMW M4 is an insurance/salvage auction lot listed with front end damage and 14,530 mi on the odometer, located at TX - HOUSTON. Before bidding, confirm the title brand with the issuing state DMV, budget for parts, repair, and re-titling/inspection, and pull the full VIN history to surface prior accidents, odometer rollbacks, and open safety recalls that the auction listing won't show.

Damage & condition assessment

The auction records FRONT END as the primary damage and REAR END as secondary damage on this 2024 BMW M4. Front-end damage typically affects the hood, bumper, headlights, radiator, and sometimes the engine cooling and airbags. Repair cost hinges on whether the frame/unibody and radiator support are bent.

Rear-end damage usually involves the trunk/hatch, rear bumper, tail lights, and quarter panels. Watch for hidden frame or fuel-system damage and rear airbag deployment on newer models.

No keys are listed — budget for a locksmith or replacement key and expect limited on-site testing. Auction condition grades reflect a quick yard assessment, not a mechanic's inspection — treat every sale as strictly as-is.

Odometer & mileage

The odometer on this 2024 BMW M4 reads 14,530 miles, recorded as "A". That is roughly in line with the ~24,000 miles expected for a 2024 model (about 7k miles/year).

Price & value context

This 2024 BMW M4 has an active bid of $24,900 at Copart. The auction's estimated retail (undamaged) value is $87,263 — the current price is about 71% below retail, though that gap has to cover repairs, fees, and re-titling.

Title status

A salvage title means an insurer declared the vehicle a total loss. It cannot be legally driven until repaired, re-inspected, and issued a rebuilt/reconstructed title by the state. For this lot the Copart listing shows a "Tx - Salvage Vehicle Title" designation.

Vehicle specifications

This 2024 BMW M4 is equipped with 6 cylinders, petrol fuel, auto transmission, v body style, finished in white. Matching parts by exact trim and drivetrain matters when estimating repair cost — confirm the build against the VIN before sourcing components.

How to buy this 2024 BMW M4 at Copart

  1. Register to bid. Copart sells to licensed dealers and, in many states, to the public through a registered broker. Verify buyer eligibility in your state first.
  2. Set your all-in budget. Add the bid price, buyer/gate/transaction fees, transport, storage, repairs, and state re-inspection/re-titling before you decide a maximum bid.
  3. Inspect thoroughly. Review every lot photo, the condition report, and — ideally — an in-person or third-party inspection, since auction sales are final and as-is.
  4. Pull the full VIN history. Auction listings omit prior accidents, title-transfer history, odometer rollbacks, and open recalls. A VIN report surfaces them before you commit.
  5. Win, pay, and arrange pickup. Complete payment within the required window and schedule transport; storage fees accrue quickly on unclaimed lots.
  6. Repair, re-inspect, and re-title. Budget time for the state's rebuilt-title inspection if the vehicle carries a salvage brand before it can return to the road.

What to check before you bid

  • Verify the title brand and status with the issuing state DMV.
  • Pull the full VIN history for accidents, prior owners, and odometer records.
  • Check open safety recalls and whether the repairs were completed.
  • Estimate parts availability and total repair cost for the recorded damage.
  • Confirm keys, drivetrain, and whether the lot runs and drives.
  • Add auction fees, transport, storage, and re-inspection to your budget.

Salvage auction risks & buyer tips

Hidden structural damage

Bent frames, unibody rails, and pillar damage are the costliest repairs and are hard to spot in listing photos. When a lot shows front, rear, or side impact, assume structural inspection is needed and price it in.

Airbag and safety-system cost

Deployed airbags, seatbelt pretensioners, and crash sensors are expensive to replace correctly. On newer vehicles these can add thousands and require dealer-level calibration.

Flood and electrical gremlins

Water-damaged cars develop intermittent electrical faults and corrosion months later. If a title or damage code hints at water, factor in full electronics risk or walk away.

Title and registration friction

A salvage vehicle must be repaired, photographed, and pass a state rebuilt-title inspection before it can be registered. Timelines and requirements vary by state — check yours before bidding.

Total-cost math

The winning bid is a fraction of your real cost. Add buyer/gate fees, transport, parts, labor, and re-inspection, then compare to clean retail value to confirm there's genuine margin.

Verify this vehicle with VinCheck tools

Pull the original window sticker by VIN to confirm factory options and MSRP, run a mileage check to catch odometer rollbacks, and check open recalls before budgeting repairs. Start with the free VIN decoder to verify the build.

Frequently asked questions

Is this 2024 BMW M4 a salvage title vehicle?

This lot is listed at COPART auction with a tx - salvage vehicle title title document. Always verify the current title status with the issuing state DMV before purchase.

How many miles does this 2024 BMW M4 have?

The odometer reads 14,530 mi (a).

Where is this vehicle located?

The lot is at TX - HOUSTON. Buyers are responsible for pickup or shipping arrangements.

Can I buy this vehicle directly?

Lots at COPART typically require a registered dealer or broker. VinCheck does not sell vehicles directly — pull a full VIN report (from $5.12/report) before bidding to spot hidden issues.

Auction & title glossary

Salvage title
A brand applied when an insurer declares a vehicle a total loss; it cannot be driven legally until rebuilt and re-inspected.
Rebuilt title
A former salvage vehicle that passed a state inspection and is road-legal again, with a permanent brand that lowers resale value.
Primary damage
The main area of impact or loss the auction records for a lot (e.g. front end, rear end, flood).
Run and drive
An auction status meaning the vehicle started, moved, and stopped under its own power during a basic yard test — not a mechanical guarantee.
Buy It Now
A fixed price to purchase a lot immediately without waiting for the live auction.
Odometer brand
A designation such as "Actual", "Not Actual", or "Exceeds Mechanical Limits" describing the reliability of the mileage reading.

Get the full 2024 BMW M4 vehicle history report — from $5.12/report

Related: More BMW lots · BMW M4 · FRONT END damage · 2024 BMW M4 market value · safety ratings · recalls · VIN check

2024 BMW M4 VIN WBS43AZ02RCP62199 photo 12024 BMW M4 VIN WBS43AZ02RCP62199 photo 22024 BMW M4 VIN WBS43AZ02RCP62199 photo 32024 BMW M4 VIN WBS43AZ02RCP62199 photo 42024 BMW M4 VIN WBS43AZ02RCP62199 photo 52024 BMW M4 VIN WBS43AZ02RCP62199 photo 62024 BMW M4 VIN WBS43AZ02RCP62199 photo 72024 BMW M4 VIN WBS43AZ02RCP62199 photo 82024 BMW M4 VIN WBS43AZ02RCP62199 photo 92024 BMW M4 VIN WBS43AZ02RCP62199 photo 102024 BMW M4 VIN WBS43AZ02RCP62199 photo 112024 BMW M4 VIN WBS43AZ02RCP62199 photo 12

VinCheck Tools & Reports

Free VIN Check VIN Decoder Used Car Value Safety Ratings Vehicle Recalls Salvage Title Check Accident History Check Stolen Vehicle Check Vehicle Lien Check Window Sticker Lookup License Plate Lookup Mileage Check Motorcycle VIN Search Canada VIN Check Salvage Auction Records Browse Cars by Make VinCheck Blog Free Car Tools Pricing How-To Guides Car Guides & Comparisons Best Cars by Category Used Car Dealer Directory Frequently Asked Questions Vehicle Data Most Stolen Cars Most Totaled Cars Most Flooded Cars Worst Cars to Buy Carfax Alternative EpicVIN Alternative AutoCheck Alternative ClearVIN Alternative Bumper Alternative FaxVIN Alternative VinAudit Alternative carVertical Alternative

License Plate Lookup by State

Alabama License Plate Lookup Alaska License Plate Lookup Arizona License Plate Lookup Arkansas License Plate Lookup California License Plate Lookup Colorado License Plate Lookup Connecticut License Plate Lookup Delaware License Plate Lookup Florida License Plate Lookup Georgia License Plate Lookup Hawaii License Plate Lookup Idaho License Plate Lookup Illinois License Plate Lookup Indiana License Plate Lookup Iowa License Plate Lookup Kansas License Plate Lookup Kentucky License Plate Lookup Louisiana License Plate Lookup Maine License Plate Lookup Maryland License Plate Lookup Massachusetts License Plate Lookup Michigan License Plate Lookup Minnesota License Plate Lookup Mississippi License Plate Lookup Missouri License Plate Lookup Montana License Plate Lookup Nebraska License Plate Lookup Nevada License Plate Lookup New Hampshire License Plate Lookup New Jersey License Plate Lookup New Mexico License Plate Lookup New York License Plate Lookup North Carolina License Plate Lookup North Dakota License Plate Lookup Ohio License Plate Lookup Oklahoma License Plate Lookup Oregon License Plate Lookup Pennsylvania License Plate Lookup Rhode Island License Plate Lookup South Carolina License Plate Lookup South Dakota License Plate Lookup Tennessee License Plate Lookup Texas License Plate Lookup Utah License Plate Lookup Vermont License Plate Lookup Virginia License Plate Lookup Washington License Plate Lookup West Virginia License Plate Lookup Wisconsin License Plate Lookup Wyoming License Plate Lookup Washington DC License Plate Lookup

VIN Check by State

Alabama VIN Check Alaska VIN Check Arizona VIN Check Arkansas VIN Check California VIN Check Colorado VIN Check Connecticut VIN Check Delaware VIN Check Florida VIN Check Georgia VIN Check Hawaii VIN Check Idaho VIN Check Illinois VIN Check Indiana VIN Check Iowa VIN Check Kansas VIN Check Kentucky VIN Check Louisiana VIN Check Maine VIN Check Maryland VIN Check Massachusetts VIN Check Michigan VIN Check Minnesota VIN Check Mississippi VIN Check Missouri VIN Check Montana VIN Check Nebraska VIN Check Nevada VIN Check New Hampshire VIN Check New Jersey VIN Check New Mexico VIN Check New York VIN Check North Carolina VIN Check North Dakota VIN Check Ohio VIN Check Oklahoma VIN Check Oregon VIN Check Pennsylvania VIN Check Rhode Island VIN Check South Carolina VIN Check South Dakota VIN Check Tennessee VIN Check Texas VIN Check Utah VIN Check Vermont VIN Check Virginia VIN Check Washington VIN Check West Virginia VIN Check Wisconsin VIN Check Wyoming VIN Check Washington DC VIN Check

Vehicle History by Make

Toyota History Honda History Nissan History Hyundai History Kia History Ford History Chevrolet History Ram History Gmc History Jeep History Dodge History Bmw History Mercedes Benz History Audi History Volkswagen History Tesla History

Salvage Auctions by State

CA Salvage Auctions TX Salvage Auctions FL Salvage Auctions NY Salvage Auctions GA Salvage Auctions NJ Salvage Auctions PA Salvage Auctions IL Salvage Auctions OH Salvage Auctions NC Salvage Auctions MI Salvage Auctions AZ Salvage Auctions

Guides

How to Check a VIN Number How to Spot Odometer Rollback How to Buy a Salvage Car How to Read a VIN Report How to Decode a WMI Find VIN from License Plate How to Value a Used Car How to Avoid Curbstoners Check Accident History Find a Stolen Car How to Read a Carfax Report Find a Motorcycle VIN Check Title Status Negotiate a Used Car Price Sunroof vs Moonroof AWD vs 4WD Salvage vs Rebuilt Title Carfax vs CarMax Texas Lemon Law Towing Capacity by VIN Best Family Cars SUVs with Captain Seats